Railways
Uretek can save time, money and disruption on railway track, platform, yard and bridge repair. Uretek’s polymer injection processes support and re-level moving and sunken hard-standing, track, platforms, weighbridge areas and buildings.
No excavations are involved, there is no dust, mess or water, and minimal disruption. Large areas can be treated at a time, and work is carried out at night if required, reducing rail possession time (an important CDM consideration). The treatment is fast, most jobs are done in a day or two and the area is trafficable immediately after treatment.