JUBAIL/KSA
APARTMENT BUILDINGS
Treated zone: 4 BUILDINGS
URETEK was contacted by the owner of the buildings. The technical team visited the site and observed settlement in some areas of the buildings, along with many diagonal cracks indicating weak soil beneath the foundations. URETEK then selected the appropriate solution for the case by performing a preliminary soil test (DCPT), which revealed weak soil layers down to a depth of 6 meters
OBJECTIVES
To fill any voids beneath the foundations and strengthen the soil in order to increase its bearing capacity and resist the imposed loads.
Following a site visit, a programme of work was designed that would take URETEK one month to complete. Ground improvement solutions were applied, allowing the site team to inject expansive geopolymer beneath the foundations to fill any voids and stabilise the existing fill areas. The technical team methodically injected at calculated points under the footing and used laser monitoring to control and verify the stabilisation process.
OUTCOME
We completed the programme of work on time, stabilised the structure, and ensured it will remain liveable for decades to come.