LOCATION: Ancona (AN) Italy
YEAR: 2004
DURATION OF WORK: 11 days
COMMITTENTE: Port of Ancona – South Pier, Dock 22
Self-propelled cranes with a static working load of 30.00 tons/sq. m operate in the service area. Heavy machinery passing over paving with a subgrade consisting of soil with poor mechanical properties and voids led to subsidence of the pavement: damage, especially depressions, which, if aggravated beyond a certain point, would have prevented the cranes from functioning properly, consequently making the dock unusable.
Customer needs
It was not possible to plan for prolonged work stoppages, so the intervention needed to be quick and minimize the impact on port activities. It also had to fully protect the safety of personnel and guarantee long-term effectiveness of the consolidation work.
Why the Port of Ancona chose Uretek:
We used our exclusive Uretek Pit Stop® technology (European patent no. 0851064) to thicken the deep subgrade of the quay paving by injecting polyurethane resins with a high swelling pressure.
As the Uretek Geoplus® resin expands, it filled the voids in the soil, compacting the surrounding solid volume and improving its mechanical and hydraulic properties. We then verified the success of the work, making 10 comparative penetration tests before and after the intervention. We stabilized 568 sq. m of paving in 11 days without the need for accessory work or demolition.